|
| image = | image_width = | image_alt = | caption = | type = Rapid transit | system = Beijing Subway | status = Under Construction | locale = | start = | end = | stations = | routes = | ridership = | open = | close = | owner = | operator = Beijing Mass Transit Railway Operation Corp., Ltd | character = | depot = | stock = | linelength = | tracklength = | notrack = | gauge = | el = | speed = | elevation = | website = | map = | map_state = collapsed }} The Western Suburb Line of the Beijing Subway (), also called the Western Suburb Branch Line (西郊支线) is a light rapid transit line planned to be built in Haidian District of Beijing. It will run west and north from Bagou on Line 10 to the Fragrant Hills - a total length of 9.4 km.〔((Chinese) )〕 The total construction cost is estimated as RMB(¥) 1 billion. The seven stations have preliminary names Bagou, Summer Palace South Gate, Summer Palace West Gate, Yuquan Park, Wan'angongmu, Botanical Gardens, and Fragrant Hills.〔 ==History== *November 24, 2008: Beijing building contract websites began to list bids for construction of a 9.3 km Western Suburban Line with total estimated cost of ¥1 billion. Construction was listed to commence on April 1, 2009 and the projected completion date was November 1, 2010.〔(Chinese) (北京轨道交通西郊线工程 tgnet.cn ) Nov. 24, 2008〕 *December 11, 2008: At the 15th Capital Urban Planning and Construction Design Conference, the Beijing City Planning Committee unveiled plans for the Fangshan, Changping, Western Suburban and Shunyi subway lines, and announced that it would strive to build two of the four lines by 2010.〔(Chinese) (Zhang, Nan and Meng Huan, "西郊线通往香山两年内有望开通" ''北京晚报'' ) Dec. 11, 2008〕 *January 6, 2009: The Haidian District government announced that construction of the Western Suburb Line would begin in 2009, though the details concerning of the line route, whether the line would be below grade or above the surface, and the number of stations, were still being decided.〔(Chinese) ("2009年北京将开工5条地铁线 10号线向西延至香山" ''中国网'' ) Jan. 6, 2009.〕 *January 15, 2009: The Beijing city planning committee unveiled the five stations along route.〔(Chinese) ("北京地铁西郊线确定设五站" ''新京报'' ) Jan. 15, 2009〕 *August 10, 2009: Planning authorities announced a change in plan for the Western Suburban Line from a train line to a tourist tram line with an operating speed of 20 km/h.〔(Chinese)("北京西郊线地铁变观光电车 车外形很像前门铛铛车" ''《新京报》'' ) Aug. 11, 2009〕 *January 7, 2010: Commencement of construction set for 2010.〔(Chinese) ("北京地铁7号线、14号线、S1线及西郊线年内开工" ) Jan. 7, 2010〕 *March 14, 2012: The route map and planning program is announced.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Western Suburban Line, Beijing Subway」の詳細全文を読む スポンサード リンク
|